Status
Active
Publish Date
Pages
165
Spec. Division
23 - Heating, Ventilating, and Air Conditioning
CCR
History: Below is a listing of the Revisions and Changes made to this UFGS.
| KEY | PREPARING ACTIVITY (PA) | A Army | N Navy | F Air Force | S NASA [ARCHIVED] |
|---|---|---|---|---|---|
| ACTION | N New | R Revision | C Change | D Deletion |
| Release | PA | Date | Action | Change # | Nature of Change or Revision |
|---|---|---|---|---|---|
| Feb-2022 | N | Nov-2008 | C | 3 | Under Related Requirements, "VAMS 23 09 53.00 20 CONTROLS AND INSTRUMENTATION BOILER PLANT" replaced with "UFC 3-430-11 BOILER PLANT INSTRUMENTATION AND CONTROL SYSTEMS"; also, the term "VAMS" has been removed throughout this section. |
| Aug-2018 | N | Nov-2008 | C | 2 | Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures. |
| Aug-2015 | N | Nov-2008 | C | 1 | UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements". |
| Nov-2008 | N | Nov-2008 | R | Deleted references to ASME B16.20 | |
| Jul-2007 | N | Jul-2007 | R | Modified for non-asbestos use. |